Yuri-jinさんのプロフィール画像

Yuri-jinさんのイラストまとめ


23 • They/Them • Just a furry • NSFW: @YuriLevz • banner by @szczurzyslawa
yuribuff.carrd.co

フォロー数:782 フォロワー数:388

Was tagged by to show 4 of my favorite works!
It was tough to choose but these are my favorite that I've made so far. (the last pic is of the best paws I've drawn and I've been reaching for that high ever since)

I'ma tag and (join me ÚwÚ) https://t.co/lLXetLRt7g

1 5

The sketch raffle prize for is finished ❤️❤️❤️

4 20

Don't ask questions

0 6

Designed an Oc with a generator based off my name and it gave me a buff fairy woman 😍

0 4

🌟400 FOLLOWER ART RAFFLE🌟

🎨Winner gets a full color halfbody

🖌️For every 50 follows an additional winner will get a fullbody colored sketch

🔄RT + Follow to enter
Tag a friend for an extra entry

🗓️Winner Picked on April 8th!

62 65

The bios are still non existent but at least I finished these icons

0 1