key🚦🎗 — ia check pinnedさんのプロフィール画像

key🚦🎗 — ia check pinnedさんのイラストまとめ


🏳️‍🌈 married to @simptoonz —edgar allan poe stan & D1 punz supporter
artfight.net/~aliasofanother

フォロー数:190 フォロワー数:590

my comfort streamers are wilbur, punz, and ranboo :D here's my oc

0 0

hey there, this isn't made by you. :] you traced @/illuxio_ 's art and I'm asking you to take this down. thanks. oh and side note, I think you could actually be good at art if you stopped tracing everyone else's. you're going to get no where if this is all you do.

0 1

felt like drawing so I made this earlier during tales :] so yes ran fanart

12 60

mine is pretty basic but here :] side note- Ican't believe I forgot the antlers in my drawing (left) (right is by @/saintsbIade)

0 2

here's some refs :D
( first is drawn by @/moonlit_isles and second is drawn by @/saintsbIade <33)

0 1

something like this :P this looks way cuter than me tho

0 0

someone needs to threaten me until I draw a ref page.... anyway s.

0 1

the lack of a ref sheet is painful- anyways here's refs (moot drew the sketch, @/moonlit_isles <3)

0 0