//=time() ?>
about time i posted some progress on my q2
brake rigging done, spring rigging done, boiler almost done, plow done, frame done, rear truck done aside from lubricators and the boiler is almost done
the piping at the front of the left side of the locomotive is basically complete - also complete is the hot water pump which the pipes lead into